首页> 外文会议>2011 International Conference on Electric Technology and Civil Engineering >Winter construction of concrete for high-rise frame-shearwall structure in cold areas
【24h】

Winter construction of concrete for high-rise frame-shearwall structure in cold areas

机译:寒冷地区高层框架-剪力墙结构混凝土的冬季施工

获取原文

摘要

Combined with high-rise frame-shearwall building of the International Education Center Project, Qiqihar University, it introduces winter construction process and winter maintenance, check calculating temperature of concrete according to Specification for Winter Construction of Building Engineering, which can be referred for construction of concrete in winter. The winter construction method of concrete structure is summarized in the severe cold region. The basic principles of comprehensive thermos method are described for the reinforced concrete structure in winter. The winter construction measures are defined further, such as reinforced works, the formwork works, in particular concrete works.
机译:结合齐齐哈尔大学国际教育中心项目的高层框架剪力墙建筑,介绍了冬季施工过程和冬季维护,根据《建筑工程冬季施工规范》检查了混凝土的温度计算,可为建筑施工提供参考。在冬天的混凝土。总结了严寒地区混凝土结构的冬季施工方法。介绍了冬季钢筋混凝土结构综合保温方法的基本原理。进一步定义了冬季施工措施,例如加固工程,模板工程,特别是混凝土工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号