首页> 外文会议>International low impact development conference >Flow Control and Water Quality Treatment Performance of a Residential Low Impact Development Pilot Project in Western Washington
【24h】

Flow Control and Water Quality Treatment Performance of a Residential Low Impact Development Pilot Project in Western Washington

机译:华盛顿西部住宅低影响开发试验项目的流量控制和水质处理性能

获取原文

摘要

Washington State University and project partners implemented a flow monitoring project on a 3.35-hectare (8.27-acre) pilot project in western Washington (Meadow on the Hylebos) that incorporates low impact development (LID) stormwater management practices. LID practices used in the project design include bioretention swales, permeable concrete, compost amended soils, and surface flow dispersion. The primary goals of the monitoring effort are to evaluate the performance of individual LID practices and evaluate the effectiveness of integrating these practices into a stormwater management system. Continuous simulation modeling (Western Washington Hydrology Model) was used to assess peak flow and flow durations compared to stated flow control goals of the project. Flow rates for individual storms were assessed and water budgets developed that include surface and subsurface flow, infiltration and evapotranspiration in relation to precipitation inputs for bioretention swales and the project as a whole. Infiltration rates over time for the permeable concrete were also measured.
机译:华盛顿州立大学和项目合作伙伴在华盛顿西部(海勒博斯的草甸)实施了一个3.35公顷(8.27英亩)试点项目的流量监测项目,该项目纳入了低影响开发(LID)雨水管理实践。项目设计中使用的LID做法包括生物滞留沼泽,可渗透混凝土,堆肥改良土壤和地表流散布。监控工作的主要目标是评估各个LID做法的绩效,并评估将这些做法整合到雨水管理系统中的有效性。与项目的既定流量控制目标相比,连续模拟模型(西华盛顿水文模型)用于评估峰值流量和流量持续时间。对单个风暴的流量进行了评估,并制定了水预算,包括与生物滞留群和整个项目的降水输入相关的地表和地下流量,入渗和蒸散量。还测量了渗透性混凝土随时间的渗透率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号