首页> 外文会议>International low impact development conference >Development of a Low Impact Development and Urban Water Balance Modeling Tool
【24h】

Development of a Low Impact Development and Urban Water Balance Modeling Tool

机译:低冲击开发和城市水平衡建模工具的发展

获取原文

摘要

The Toronto and Region Conservation Authority (TRCA), Lake Simcoe Region Conservation Authority (LSRCA), and Credit Valley Conservation Authority (CVC), "the GTA CAs," have worked collaboratively to identify preferred low impact development (LID) stormwater management (SWM) models suitable for meeting typical design criteria. The GTA CAs research and experimentation efforts with various LID SWM case studies will inform the audience of model criteria and rationale that supports the selection of preferred open-source and/or commercial license LID modeling tool(s) which effectively demonstrate design targets have been met. The GTA CAs commissioned Golder Associates Ltd. to provide programming support and water resources expertise to support the development of the LID Treatment Train Tool (LID TTT) for Ontario, presently in a working beta version for review and experimentation before a planned hard launch in late March, 2017. The primary intention of the LID TTT is to support more consideration and realization of LID opportunities for a proposed site plan, throughout the design process undertaken by planners, SWM designers, and other decision makers for all types of site development or retrofit projects. The LID TTT will process computational results from EPA-SWMM to provide an assessment of stormwater runoff volume and associated target depths, along with total suspended solids (TSS) and total phosphorus (TP) reductions for both annual and event based scenarios, throughout the design process. A preliminary water budget assessment for pre and post conditions is also provided in the beta version of the LID TTT.
机译:多伦多和地区保护局(TRCA),辛科湖地区保护局(LSRCA)和信用谷保护机构(CVC),“GTA CAS”,合作地工作,以确定优先的低影响开发(LID)雨水管理(SWM )适用于满足典型设计标准的模型。 GTA CAS的研究和实验努力与各种盖子SWM案例研究会通知,支持支持选择优选的开源和/或商业许可证盖建模工具的模型标准和理由,这些标准和/或商业许可证盖建模工具有效地展示了设计目标。 GTA CAS委托Golder Associates Ltd.提供编程支持和水资源专业知识,以支持安大略省的盖盖治疗火车工具(盖TTT)的开发,目前在延迟计划硬发射之前进行审查和实验的工作测试版。盖子TTT的主要目的是支持更多地考虑和实现拟议的网站计划的盖子机会,在整个计划人员,SWM设计人员和其他决策者为所有类型的场地开发或改造的决策者开展的整个设计过程中项目。盖子TTT将处理EPA-SWMM的计算结果,以便在整个设计中提供对雨水径流量和相关目标深度的评估,以及总暂停的固体(TSS)和总磷(TP)减少,在整个设计中过程。在盖子TTT的Beta版本中还提供了预先和后期条件的初步水预算评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号