首页> 外文会议>European corrosion congress;EUROCORR 2010 >Cathodic protection of LPG mounded vessels - Specific solutions for particular problems
【24h】

Cathodic protection of LPG mounded vessels - Specific solutions for particular problems

机译:液化石油气堆场船只的阴极保护-特殊问题的解决方案

获取原文

摘要

Corrosion of LPG Tanks is, among others, a long term risk for safety. Apart the many rules implemented, also by learned lessons from past accidents, corrosion protection of LPG Tanks is quite a special application. Our experience in new large capacity Mounded LPG Systems has led to focus specific "HOT SPOTS" in the various phases of design, installation, commissioning and operation of such systems. In order to be successful, the design, materials selection, site erection procedures and operation of a Cathodic Protection system should come alongside the above said phases, thus making aware the CP specialists of the peculiarities that can influence the implementation of such type of installation. The complex various phases of site erection of two 2000 m3 LPG mounded tanks in Madinah (KSA) area, and the subsequent positive commissioning results, together with the development of a new modular CP Equipment devoted to such type of Complex Structures, including an "in-built" specific Monitoring System are presented and discussed. The implementation of the CP System involved many kinds of specific competences in various fields such as mechanical installation, choice of soil and proper compaction, careful verification of coating damages and the relevant repair, design of the installation of groundbeds and permanent reference electrodes, wiring of the whole system up to the Control Room. Commissioning has confirmed that in such complex structure the unavoidable presence of hidden "hot spots" can be healed thanks to the preventative measures taken in the various phases of the CP design and installation.
机译:除其他外,液化石油气储罐的腐蚀是安全的长期风险。除了已实施的许多规则,以及从过去事故中吸取的教训之外,液化石油气储罐的腐蚀防护是一种非常特殊的应用。我们在新型大容量立式液化石油气系统中的经验已导致将特定的“ HOT SPOTS”集中在此类系统的设计,安装,调试和操作的各个阶段。为了获得成功,阴极保护系统的设计,材料选择,现场安装程序和操作应与上述阶段同时进行,从而使CP专家了解可能影响此类安装实施的特殊性。麦地那(KSA)地区的两个2000 m3液化石油气堆式储罐在工地复杂的各个阶段进行安装,随后取得了积极的调试结果,同时开发了专门用于此类复杂结构的新型模块化CP设备,包括“提出并讨论了“内置”特定监视系统。 CP系统的实施涉及各个领域的许多特定能力,例如机械安装,土壤选择和正确压实,仔细检查涂层损坏和相关的维修,接地床和永久参比电极的安装设计,整个系统直到控制室。调试已经证实,由于CP设计和安装的各个阶段都采取了预防措施,在这种复杂的结构中,不可避免的隐藏“热点”可以得到修复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号