首页> 外文会议>European simulation and modelling conference >IMPROVING THE JOB-SHOP WORKLOAD CONTROL THROUGH ORDER ACCEPTANCE AND DUE-DATE NEGOTIATION
【24h】

IMPROVING THE JOB-SHOP WORKLOAD CONTROL THROUGH ORDER ACCEPTANCE AND DUE-DATE NEGOTIATION

机译:通过订单验收和截止日期协商改善工作店工作负载控制

获取原文

摘要

Work flows in a job-shop are determined not only by the release load but also by the number of accepted orders. In this paper the common assumption of accepting all incoming orders regardless of shop condition is relaxed. Instead of placing the orders in a 'pre-shop pool' queue, as in previous research, orders that arrive at the shop, when it is highly congested, may be immediately rejected or their due dates may be negotiated. This paper explores the idea of controlling the workload since the acceptance/rejection stage. A new acceptance/rejection rule is proposed, and tests are conducted to study the sensitivity of job-shop performance to different order acceptance parameters, like the tolerance of the workload limit and the due date extension acceptance. The effect of the negotiation phase on the job-shop performance is evaluated using a simulation model of a generic random job-shop that allow us to conclude that having a negotiation phase prior to rejection improves almost all workload performance measures. Different tolerances of the workload limit slightly affect the performance of the job-shop.
机译:工作商店中的工作流量不仅由释放负载确定,而且由已接受订单的数量决定。在本文中,放宽了接受所有进入订单的共同假设。与以前的研究中一样,在以前的研究中,当达到商店的订单,当它高度拥塞时,可能会立即被拒绝或者可以立即拒绝或者他们的到期日可以立即拒绝或者可能会谈判。本文探讨了自接受/拒绝阶段以来控制工作量的想法。提出了一种新的验收/拒绝规则,并进行了测试,以研究求职性能对不同订单验收参数的敏感性,如工作负载限制和截止日期扩展验收的容忍度。使用通用随机作业商店的模拟模型评估协商阶段对作业商店性能的影响,这些模型允许我们得出结论,在拒绝之前进行协商阶段,提高了几乎所有工作负载性能措施。工作负载限制的不同公差略微影响了作业的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号