首页> 外文会议>International Mining Forum >Rockburst Prediction of Deep Mining in Tectonic Stress Mine
【24h】

Rockburst Prediction of Deep Mining in Tectonic Stress Mine

机译:构造应力矿深部开采的岩爆预测

获取原文

摘要

As more than 40 years’ mining in Chengchao Iron Mine, the excavation depth now is arriving at -600m level, and rockburst is becoming one of the main safety problems during the deep mining in the tectonic stress mine, so as to predict the possibility and intensity, rock specimens from the depth of -430 meters to -700 meters are obtained for systematical rocks mechanics testing. Based on various prediction criteria, the different intensity of the wall rock for rockburst are ascertained. Combined with the measured in-situ stresses, the model of the in-situ stresses field is established, and elastic strain energy of wall rock is confirmed by the strain numerical simulation, judging by the engineering research and site monitoring, the critical mining depth for rockburst is obtained. At last, according to the above analysis, the possibility of rockburst during deep mining and its potential depth in Chengchao Iron mine is predicted.
机译:成城铁矿开采已有40多年的历史,目前开挖深度已达-600m,在构造应力矿的深部开采中,岩爆已成为主要的安全问题之一,从而可以预测成矿的可能性和可能性。强度,可以获取-430米至-700米深度的岩石标本,以进行系统的岩石力学测试。根据各种预测标准,确定岩爆的围岩强度不同。结合测得的地应力,建立了地应力场模型,并通过应变数值模拟,工程研究和现场监测,确定了岩壁的临界开采深度,确定了围岩的弹性应变能。获得岩爆。最后,根据以上分析,对城巢铁矿深部开采过程中发生岩爆的可能性及其潜在深度进行了预测。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号