首页> 外文会议>IEEE Power and Energy Society General Meeting >Research on the Technology of Ultra-long Power Supply in Low Voltage for Tunnel Construction
【24h】

Research on the Technology of Ultra-long Power Supply in Low Voltage for Tunnel Construction

机译:隧道施工低压超长电源技术研究

获取原文

摘要

Voltage drop in the cable line is a significant problem in today's ultra-long low voltage power supply system. It caused the problem that electricity demands of the system and the requirement of transmission distance cannot be fulfilled. The technique that imports 10 kV or 35 kV class Voltage into the tunnel has been used as the solution. But it extends the project cycle, largely increases the budget and brings security concerns. The paper analyses the 400 V long distance power supply problem and compares reactive power compensation devices through MatIab/Simulink simulations, such as the shunt capacitor, SVC (Static Var Compensator), STATCOM (Static Synchronous Compensator) and OCC-STATCOM. The OCCSTATCOM demonstrates better capacity of real-time power load tracking and shows higher transmission power in the construction. The paper also does OCC-ST A TCOM correction based on real projects.
机译:电缆线路电压下降是当今超长低压电源系统中的一个重要问题。它导致该系统的电力需求和传输距离的要求无法实现。将10 kV或35 kV类电压进入隧道的技术已被用作解决方案。但它扩展了项目周期,大大增加了预算并带来了安全问题。本文分析了400 V长距离电源问题,并通过Matiab / Simulink模拟进行了比较了无功功率补偿装置,例如并联电容器,SVC(静态VAR补偿器),Statcom(静态同步补偿器)和OCC-Statcom。 CONCSTATCOM展示了更好的实时功率负载跟踪能力,并在构造中显示了更高的传输功率。本文还基于实际项目进行OCC-ST A TCOM校正。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号