首页> 外文会议>2010 7th International Conference on Service Systems and Service Management >A robust integrated approach to yard space allocation and crane scheduling in container terminals
【24h】

A robust integrated approach to yard space allocation and crane scheduling in container terminals

机译:集装箱码头堆场空间分配和起重机调度的可靠集成方法

获取原文

摘要

To minimize the total workload delayed in the terminal yard, an integrated model of yard space allocation and crane scheduling is proposed. To deal with the uncertainty in pick-up process of import containers, a robust optimization model is suggested to simultaneously determine the storage locations of import containers and the routes of yard crane movements. A Lagrange relaxation algorithm and a modified method are proposed. Numerical experiments show that the proposed approach meets the requirement of practical applications.
机译:为了最大程度地减少码头堆场中延迟的总工作量,提出了堆场空间分配与起重机调度的集成模型。为了应对进口集装箱取货过程中的不确定性,建议使用鲁棒的优化模型来同时确定进口集装箱的存放地点和堆场起重机的移动路线。提出了一种拉格朗日松弛算法和一种改进的方法。数值实验表明,该方法能够满足实际应用的要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号