首页> 外文会议>2010 International Conference on Management and Service Science >Research on the Project-Level Influencing Factors on Information Technology Implementation in Construction Industry
【24h】

Research on the Project-Level Influencing Factors on Information Technology Implementation in Construction Industry

机译:建筑业信息技术实施的项目层面影响因素研究

获取原文

摘要

Based on the industry environment characteristics of the construction field, the TIEPI model of influencing factors on IT implementation in construction project is constructed; According to this model, this paper then systemically reviews key project-level influencing factors, including collaborative maturity of project members, technology propagation model of the project, complexity of the project, duration of the project and IT initiation stage of the project, and analyses how these factors influence IT implementation respectively. While providing a guide for industry participants to successfully apply IT, this paper also offers a systemic model basis for future researches. In the future researches, more concern should be given to investigate the influencing factors for IT implementation in the construction projects in developing countries and to quantitatively analyze relationships between different level influencing factors.
机译:基于建筑领域的行业环境特征,构建了IT施工项目IT实施因素的TIEPI模型;根据该模型,本文自系统地评估重点项目级影响因素,包括项目成员的协作成熟,项目的技术传播模型,项目的复杂性,项目的持续时间和项目的启动阶段,以及分析这些因素如何分别影响IT。在为行业参与者提供成功应用的指南的同时,本文还为未来的研究提供了系统性模型基础。在未来的研究中,应更加担忧来调查发展中国家建设项目中IT实施的影响因素,并定量分析不同水平影响因素之间的关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号