The Resource Constraints Project Scheduling Based on DSM

机译:基于DSM的资源约束项目调度

获取原文

摘要

with the improvement of project complexity, project management become important more and more, especially project schedule phase. Project schedule not only solve the project time conflict, but also project other resources conflict. So it is necessary to research resource constraints project schedule. The Resource constraints usually lead to project tasks delays and rework, because the tasks have to use serial structure and coupling structure. For solving this problem, the paper proposes a model based on design structure matrix (DSM) to optimize the serial structure and coupling structure, and sets time-factor (TF) parameters to consider the time impacts of the resource constraints. The model that integrates TF into DSM can optimize above- mentioned logical structures efficiently, and then shorten the project time effectively. Meanwhile, DSM applies simple calculation procedures to construct solution, and the used formulas in model are easily calculation, so the operation processes of project scheduling is very convenient. Therefore the model for project schedule and reasonable tasks sorting is highly practical value.
机译:随着项目复杂性的提高,项目管理变得越来越重要,特别是在项目进度阶段。项目进度表不仅解决了项目时间冲突,而且解决了项目其他资源冲突。因此有必要研究资源约束项目的进度。资源约束通常会导致项目任务延迟和返工,因为任务必须使用串行结构和耦合结构。为了解决这个问题,本文提出了一种基于设计结构矩阵(DSM)的模型,以优化串行结构和耦合结构,并设置时间因子(TF)参数来考虑资源约束的时间影响。将TF集成到DSM中的模型可以有效地优化上述逻辑结构,然后有效地缩短项目时间。同时,帝斯曼采用简单的计算程序来构造解决方案,并且模型中使用的公式易于计算,因此项目调度的操作过程非常方便。因此,项目进度表和合理的任务分类模型具有很高的实用价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号