TRACKING COST AND SCHEDULE GROWTH OF UNMANNED SPACECRAFT: LESSONS LEARNED FROM NASA'S CADRE DATABASE

机译:跟踪无用空间工艺的成本和进度表:从NASA的CADRE数据库中学习的经验教训

获取原文

摘要

The lack of consistency in cost and schedule records of space programs makes cross-mission analysis a challenging task. Using data from the Cost Analysis Data Requirement studies (CADRe) conducted by NASA, this work investigates what lessons can be learned regarding cost and schedule growth of NASA 's space systems. Specifically, this paper identifies trends in engineering and programmatic cost and schedule growth by examining the estimates made at different milestones of the development of the space systems in the database. We discuss the possible correlation between the derived scheduled and cost estimates and various design parameters, such as mass, nominal power, and design lifetime. We also identify the extent to which cost and schedule growth are coupled phenomena in our data sample. Finally, we make recommendations on how to record cost and schedule information for the CADRe database more consistently, based on our experience in collecting the data used for this research.
机译:空间计划的成本和进度记录缺乏一致性,使得跨任务分析成为一项具有挑战性的任务。利用NASA进行的成本分析数据需求研究(CADRe)中的数据,这项工作调查了有关NASA太空系统的成本和进度增长的经验教训。具体来说,本文通过检查在数据库空间系统发展的不同里程碑所做的估算,确定了工程和计划成本以及进度增长的趋势。我们讨论了派生的计划和成本估算与各种设计参数(例如质量,标称功率和设计寿命)之间的可能相关性。我们还确定了数据样本中成本和进度增长耦合现象的程度。最后,根据我们收集用于本研究的数据的经验,我们就如何更一致地记录CADRe数据库的成本和进度信息提出建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号