首页> 外文会议>SME annual meeting exhibit;CMA's national western mining conference >IMPLEMENTATION OF ADVANCE CONTROL ON ROUGHER FLOTATION AT TECK POGO MINE
【24h】

IMPLEMENTATION OF ADVANCE CONTROL ON ROUGHER FLOTATION AT TECK POGO MINE

机译:泰克波哥矿粗浮的超前控制实施

获取原文

摘要

The Pogo Mine, near Delta Junction, Alaska is a 2500 TPD gold operation employing processes including grinding, gravity, rougher flotation, leach, CIP, and E/W. An OCS(Optimizing Control System) expert control system has been implemented on rougher flotation in early 2008. The OCS system communicates with the Plant DCS(Distributed Control System) through OPC(OLE for Process Control) communication. The initial strategy was to control the flotation cell froth level set points to achieve target froth velocities. This strategy was enhanced by controlling both level and air flow setpoints. The flotation cell air and level are adjusted to reach cell pulling rates (froth velocities). The pulling rate setpoints for each cell are determined based on downstream capacity (concentrate surge tank level). The effect of pH and upstream disturbances is also taken into account in adjusting the air and level setpoints. Feed forward compensation is employed down the flotation row to minimize disturbances.
机译:阿拉斯加三角洲交界处附近的Pogo矿是2500 TPD的金矿,采用的工艺包括研磨,重力,粗浮选,浸出,CIP和E / W。 OCS(优化控制系统)专家控制系统已在2008年初进行了粗浮选。该OCS系统通过OPC(过程控制用OLE)通信与工厂DCS(分布式控制系统)进行通信。最初的策略是控制浮选槽泡沫水平设定点,以达到目标泡沫速度。通过控制水平和气流设定点来增强此策略。调节浮选池的空气和液位,以达到浮选速率(泡沫速度)。根据下游容量(浓缩液箱高度)确定每个单元的提拉速率设定点。在调节空气和水平设定点时,还应考虑到pH值和上游干扰的影响。在浮选行下采用前馈补偿,以最大程度地减少干扰。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号