首页> 外文会议>2009 rapid excavation and tunneling conference proceedings >PROPOSED CONTRACTING PRACTICES FOR THE CALTRAIN DOWNTOWN EXTENSION
【24h】

PROPOSED CONTRACTING PRACTICES FOR THE CALTRAIN DOWNTOWN EXTENSION

机译:扩建盐城的拟议合同做法

获取原文

摘要

The Caltrain Downtown Extension (DTX) project will extend commuter and future statewide high-speed rail service into the Transbay Transit Center, which will be located in the business district in downtown San Francisco. The DTX project includes 1.5 miles of underground construction, comprising complex sections of mined and cut-and-cover tunnel.As part of the DTX preliminary engineering process, development of appropriate contracting practices, including contract packaging, procurement methods and contract terms for the underground construction, has been initiated. This paper provides a summary of the evaluations undertaken, preliminary conclusions reached, and proposed next steps to promote industry interest and maximize bid competition.
机译:Caltrain Downtown Extension(DTX)项目将通勤和未来的全州高铁服务扩展到Transbay Transit Center,该中心将位于旧金山市区的商业区。 DTX项目包括1.5英里的地下建筑,包括复杂的采掘和掩埋式隧道部分。 作为DTX初步工程过程的一部分,已经开始开发适当的合同惯例,包括地下建筑的合同包装,采购方法和合同条款。本文总结了所进行的评估,得出的初步结论,并提出了提高行业兴趣和最大程度提高投标竞争性的下一步措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号