In September 2003, Dominion applied to the U.S. Nuclear Regulatory Commission for an Early Site Permit (ESP) related to the addition of two new nuclear units at the existing North Anna Power Station located on Lake Anna in Virginia. The cooling system design proposed for the Unit 3 heat sink was a once-through open cycle system using Lake Anna as the source waterbody (Unit 4 was proposed to have dry cooling). During agency and public review of the Draft Environmental Impact Statement and Virginia Department of Environmental Quality's concurrence with Dominion's certification of the Coastal Zone Management Act, concerns were raised about the thermal impact and evaporative water loss associated with the new Unit. To address these concerns, Dominion changed the design for Unit 3 to a closed-cycle dry and wet combination (hybrid) cooling system. Information is presented that describes the conceptual design and operation of the cooling system, water use scenarios, and estimated impacts on water consumption, power consumption and plant efficiency.
机译:2003年9月,统治于美国核监管委员会的早期现场许可(ESP)与在弗吉尼亚州安娜湖的现有北安娜电站增加了两家新的核单位。为单元3散热器提出的冷却系统设计是使用湖泊源水体(提出的单元4具有干燥冷却)的Anna的一秒钟开放循环系统。在对环境影响声明和弗吉尼亚州环境质量的同意中的佛罗里达州的沿海地区管理法认证的情况下,对沿海地区管理行为的认证的审查中,提出了与新单位相关的热冲击和蒸发水分的担忧。为了解决这些问题,Dominion将单元3的设计改为闭循环干燥和湿式组合(混合)冷却系统。提出了描述的信息,描述了冷却系统的概念设计和操作,水使用场景和对耗水,功耗和工厂效率的估计影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号