首页> 外文会议>International conference on advances in nuclear power plants;ICAPP 2008 >An Integral Effect Test on the Reflood Period of a Large-Break LOCA for the APR1400 Using the ATLAS
【24h】

An Integral Effect Test on the Reflood Period of a Large-Break LOCA for the APR1400 Using the ATLAS

机译:使用ATLAS对APR1400的大断裂LOCA的回潮期进行整体效果测试

获取原文

摘要

A thermal-hydraulic integral effect test facility, ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation), has been constructed at KAERI (Korea Atomic Energy Research Institute). It is a 1/2 reduced height and 1/288 volume scaled test facility based on the design features of the APR1400, an evolutionary pressurized water reactor developed by the Korean industry. After intensive performance tests had been conducted to verify its operational performance and controllability for major thermal hydraulic components, a set of integral effect tests on the reflood period of a large break LOCA (Loss of Coolant Accident) was performed by using the ATLAS. The present ATLAS Test No. 9 is one of separate effect reflood tests investigating the thermal-hydraulic characteristics during an entire reflood period to provide reliable data to help in validating the LBLOCA analysis methodology for the APR1400. The initial and boundary conditions were obtained by applying scaling ratios to the MARS simulation results. The decay heat and the ECC water flow rate from the safety injection tank were simulated from the start of the reflood period. The ECC water flow rate from the high pressure safety injection pump was 0.32 kg/s. The system pressure was fixed at around 0.1 MPa and the initial outer wall temperature was determined to be 205°C. The experimental results showed the typical thermal-hydraulic trends expected to occur during the reflood phase of the large-break LOCA scenario.
机译:在KAERI(韩国原子能研究所)已经建造了热工-液压整体效应测试设备ATLAS(用于事故模拟的高级热工-液压测试回路)。它是根据韩国工业开发的APR1400(一种进化的压水反应堆)APR1400的设计特点而减低高度1/2和按体积进行1/288规模测试的设备。在进行了密集的性能测试以验证其对主要热力液压组件的操作性能和可控性之后,使用ATLAS对大断裂LOCA(冷却液事故损失)的回潮期进行了一组整体效果测试。当前的ATLAS测试编号9是一项单独的效果回注测试,用于研究整个回注期间的热工液压特性,以提供可靠的数据,以帮助验证APR1400的LBLOCA分析方法。初始条件和边界条件是通过将缩放比例应用于MARS仿真结果而获得的。从注水期开始就模拟了来自安全注入箱的衰变热和ECC水流量。高压安全注射泵的ECC水流量为0.32 kg / s。系统压力固定在0.1 MPa左右,初始外壁温度确定为205°C。实验结果表明,在大断裂LOCA情景的回采阶段预期发生典型的热工水力趋势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号