A 12.3 km long sea crossing is currently under construction at Incheon in South Korea. At a cost ofUS$1.4 billion, the crossing will link the new Incheon International Airport on Yeongjong island toSongdo (New City) and the new International Free Enterprise Zone (IFEZ) which are both currentlyunder construction. A cable stayed bridge will cross the 625.5m wide by 74m high navigationchannel leading to the Port of Incheon. With an 800m long main span, this will be the longestspanning bridge in South Korea and will form part of one of the longest sea crossings in the world.A joint venture team comprising Halcrow, Arup and local consultant Dasan was appointed bydesign and construct contractor Samsung Construction JV (SCJV) as the Contractor's CheckingEngineer (CCE) in March 2005.
机译:韩国仁川目前正在建设12.3公里。 at 14亿美元,交叉口将在云居岛上联系新仁川国际机场 Songdo(新城市)和新的国际自由企业区(IFEZ)目前 🚧正在施工🚧。 电缆停留的桥梁将越过74米高的625米高的导航 通往仁川港的渠道。 随着800米长的主跨度,这将是最长的 在韩国的跨越桥梁,将形成世界上最长的海洋交叉口之一的一部分。 由达桑组成的合资团队包括有三峡,Arup和地方顾问达珊被任命为 设计与构建承包商三星建筑JV(SCJV)作为承包商的检查 2005年3月的工程师(CCE)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号