首页> 外文会议>Wireless Communications, Networking and Mobile Computing, 2007 International Conference on >Model for Construction Project Scheduling and Updating Considering the Dependent Randomness of Activities
【24h】

Model for Construction Project Scheduling and Updating Considering the Dependent Randomness of Activities

机译:考虑活动随机性的建设项目进度计划与更新模型

获取原文

摘要

In practice, the durations of activities are not independent random variables but rather dependent random variables. In this paper, an expert system is proposed to model the dependence of activity durations in project scheduling networks and to update the
机译:实际上,活动的持续时间不是独立的随机变量,而是相关的随机变量。本文提出了一个专家系统来对项目调度网络中活动持续时间的依赖性进行建模并更新

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号