The Qikiqtani General Hospital is a 2-storey addition with a one-storey fan room located in Iqaluit, Nunavut. With an opening scheduled for the summer of 2007, the project challenged the structural consultant for the project with obstacles that were largely defined by the realities of northern construction, specifically those of Baffin Island. The key challenges were scheduling due to the short sea shipping season for Iqaluit, local site conditions compounded by time constraints which influenced the design of the foundations, and the design and the installation of the rock socketted piles. Due to the complexity of the geometry and site conditions not anticipated in the design phase some of the piles required remedial action. The lessons learned from this project included the need to use with caution southern construction assumptions, the need for design agility to maximize the use of on-site materials when developing remedial details and the effect the accelerated scheduling of the project has on design manpower resources and costs in general.
机译:该Qikiqtani总医院是一栋2层楼除了与位于伊魁特,努纳武特地区一个一层楼的风机房。定于2007年夏天的开口,该项目的挑战项目的结构顾问认为主要是由北方建设的实际情况,特别是那些巴芬岛的定义障碍。关键的挑战是调度由于短途海运赛季伊魁特,由此影响了地基的设计,以及设计和岩石的安装时间约束加剧当地的场地条件socketted桩。由于在设计阶段没有预期的几何形状和场地条件复杂一些桩所需的补救行动。制订补救的细节和设计人力资源项目的加速计划有效果,当从该项目中获得的经验教训包括:需要谨慎南部建设的假设,需要设计的灵活性,最大限度地利用现场材料的使用在一般费用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号