首页> 外文会议>Hydropower 2006 International Conference >CONSTRUCTION TECHNIQUES OF EXCAVATION AND SUPPORTOF 600M HIGH SLOPE AT RIGHT BANK OF XIAOWAN Hydropower Station
【24h】

CONSTRUCTION TECHNIQUES OF EXCAVATION AND SUPPORTOF 600M HIGH SLOPE AT RIGHT BANK OF XIAOWAN Hydropower Station

机译:小湾水电站右岸600m高边坡开挖支护施工技术。

获取原文

摘要

Slope at the right bank of Xiaowan Hydropower Station is 600m – 700m high, theslope is steep, the geological conditions are complicated, and the construction is intense and highlydifficult. It’s a difficult issue to people as how to construct the high slope safely and expeditiously.Under the guidance of national famous hydropower experts like Academinican Mr. Ma Hongqi andProfessor Zhang Zhenyu, and with the joint effort of the participating units, the difficulties werefinally resolved, and the safe and expidite construction of high slope was realized. This papersummarizes the major construction techniques and methods adopted in the high slope construction.
机译:小湾水电站右岸边坡高600m-700m。 坡度陡峭,地质条件复杂,施工强度高 难的。对于人们来说,如何安全,迅速地建造高坡度是一个难题。 在国家著名水电专家的指导下,例如:Academinican Ma Hongqi先生和 张振宇教授,在与会单位的共同努力下,困难重重。 最终解决,实现了高边坡的安全快速施工。这篇报告 总结了高边坡施工中采用的主要施工技术和方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号