首页> 外文会议>Offshore technology conference >Tripping the Light Fantastic - When 3 Becomes 1
【24h】

Tripping the Light Fantastic - When 3 Becomes 1

机译:绊倒光明 - 当3变成1时

获取原文

摘要

This paper addresses the hurdles that have prevented the single-trip installation of upper and lower completions in the complex world of subsea and deepwater applications. It examines the processes, technologies, and risk mitigation steps that took a concept from pilot to successful deployment.This paper examines the current practice and rationales that had dictated a near 30-year industry standard methodology. This was not a case of tearing up the rule book, but of re-writing certain chapters. Our study examines the methods used to evaluate risks, mitigate same, test thought processes through to systems integration testing, and ultimately take what was a complete-the-well-on-paper exercise to a complete-the-well-in-practice outcome. The study will look at novel and not-so-novel technologies deployed; why were they chosen and how were they qualified.Offshore and deepwater activity is returning; cost control, better project management and new technologies have provided a step-change in project economics. Typically, the completion of certain deepwater wells will necessitate the separate deployment of sand face, intermediate and upper completion. But what would result if this could be done in a single trip? In the simplest terms, completing in a single trip reduces the overall completion time by half and more. The case against is well founded; building the case for the change of long-established methods in our industry has never been an easy task. The steps taken to build this case will be examined, how fear of the new was overcome, and, having established proof-of-concept and beyond, taking the project to a fruitful outcome will be explored. However, what will be explored is no silver bullet, has no universal appeal and requires diligence, planning and contingency to drive success. But the prize is there, the risks can be mitigated, and when successful, will deliver an impact on project economics that very few technologies and techniques have delivered on such a scale.
机译:本文解决了阻碍了在海底和深水应用的复杂世界中的上下完整的单行程安装的障碍。它探讨了从飞行员概念到成功部署的过程,技术和风险缓解步骤。本文审查了目前决定了近30年行业标准方法的现行实践和理由。这不是撕毁规则书的情况,而是重新编写某些章节。我们的研究审查了用于评估风险的方法,相同,测试思想流程通过系统集成测试,最终将一个完整的纸张练习施加到完整的实际情况上。该研究将研究部署的小说和非那么新的技术;他们为什么选择,他们是如何合格的.Offshore和深水活动正在返回;成本控制,更好的项目管理和新技术提供了项目经济学的一步变化。通常,某些深水井的完成将需要单独部署沙面,中间和上部。但是,如果可以在一次旅行中可以完成什么?在最简单的术语中,在一次行程中完成将整体完成时间减少了一半等。案件是良好的成立;建立案例为我们行业中长期既定方法的变化,从未如此简单。将探讨采取这种案件的采取措施,如何克服新的恐惧,以及建立概念证明和超越的,将该项目探讨将探讨富有成效的结果。但是,将探索的是没有银弹,没有普遍上诉,需要勤奋,规划和应急推动成功。但奖品是在那里,可以减轻风险,并且在成功时,将对项目经济学产生影响,这很少有技术和技术在这种规模上提供。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号