MOST SIGNIFICANT CAUSES FOR REWORK DUE TO ENGINEERING DELIVERABLES

机译:由于工程可交付成果,最显着的返工原因

获取原文

摘要

Construction Owners Association of Alberta (COAA) Field Rework Committee is developingindustry Best Practices for reducing and preventing construction field rework. As part of this mandate, asub-committee of rework is assigned to identify the most significant causes for rework due to engineeringdeliverables and to develop best practices. The purpose of this paper is to demonstrate the prioritizationof the most critical rework issues related to engineering deliverables assessed by experiencedconstruction project management experts in the industrial construction sector of Alberta. The root causeanalysis and influence diagrams developed by the rework sub-committee of Construction OwnersAssociation of Alberta under major sub-headings of Errors and Omissions in Engineering Work Packages,Late Design Changes, Project Document Controls and Scope Changes are explained in the paper. Thesub-committee's goals to develop best practices are also outlined in the paper.
机译:阿尔伯塔省建筑业主协会(COAA)现场返修委员会正在发展中 减少和防止施工现场返工的行业最佳实践。作为这项任务的一部分, 分配了返工分委员会来确定由工程引起的返工的最重要原因 可交付成果并制定最佳实践。本文的目的是演示优先级 经验丰富的工程师评估了与工程交付品相关的最关键的返工问题 艾伯塔省工业建筑部门的建筑项目管理专家。根本原因 业主返修小组委员会制定的分析和影响图 艾伯塔省协会,主要负责工程工作包中的错误和遗漏, 本文介绍了后期设计更改,项目文档控制和范围更改。这 该文件还概述了小组委员会开发最佳实践的目标。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号