Blue Streak was a missile for which contracts were awarded in 1955. On April 13, 1960 it was cancelled. The cost of the project was estimated at £65 million. The estimated cost to bring the missile into operational service in 1965 was £600 million. The project has been dismissed as the victim of a poor technical choice. The missile was liquid fuelled which has been quoted as the reason for its cancellation. Authors quote it as the only reason stating that the entire weapon system was in fact obsolescent because of the choice of fuel. It is intended to suggest that Blue Streak was not rendered obsolete because of the choice of fuel and that those who make the suggestion fail to understand the scale or the complexity of the failure. Liquid fuel has been a useful scapegoat to conceal a significant failure of the institutions and organisations that controlled the project.
机译:蓝色条纹是1955年获得合同的导弹。1960年4月13日被取消。该项目的费用估计为6500万英镑。 1965年将导弹投入运行的估计费用为6亿英镑。该项目因技术选择不当而被驳回。导弹是液体燃料,被引为取消导弹的原因。作者将其作为唯一理由说明,由于选择了燃料,整个武器系统实际上已经过时了。旨在建议不要因为选择燃料而使“蓝色条纹”过时,并且提出建议的人无法理解失败的规模或复杂性。液体燃料一直是掩盖控制该项目的机构和组织的重大失败的有用替罪羊。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号