首页> 外文会议>World tunnel congress >Ground improvement during excavation of the Madrid Underground's Line 1 extension
【24h】

Ground improvement during excavation of the Madrid Underground's Line 1 extension

机译:马德里地铁1号线扩建工程开挖期间的地面改良

获取原文

摘要

The Line 1 extension was undertaken in the Madrid Underground Extension. Excavation work was carried out by two methods: a) the Milan method (cut-and-cover) and b) underground excavation using the Traditional Madrid Method, a varient of the old Bellgian Method. In order to reduce damage to building, two ground improvement systems were used: a) Compaction grouting, where the tunnel is located under buildings and b) Jet-grouting walls, between the structures and the tunnel, where the tunnel centre line was parallel to the buildings. This paper describes the ground characteristics, excavation process and ground improvements designed. The results obtained from the special treatment and auscultation work are also included.
机译:在马德里地下延伸方面进行了第1行延期。挖掘工作由两种方法进行:a)米兰方法(切割)和b)使用传统马德里方法的地下挖掘,旧的锥体方法的变化。为了减少建筑物的损坏,使用了两个接地改进系统:a)压实灌浆,隧道位于建筑物和b)喷射灌浆墙壁,结构和隧道之间,隧道中心线平行于那些建筑。本文介绍了设计的地面特性,挖掘过程和地面改进。还包括从特殊处理和听诊工作获得的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号