首页> 外文会议>SPE European formation damage conference >Utilization of sand control and mechanical profile control in numbi field water injection wells
【24h】

Utilization of sand control and mechanical profile control in numbi field water injection wells

机译:numbi油田注水井防砂与机械调剖的应用。

获取原文

摘要

The Numbi field is located approximately 20 miles offshore of the Cabinda enclave of Angola. The main producing reservoir in the Numbi field, the 57-05 Upper Vermelha reservoir, is comprised of a stacked sequence of near shore deposits approximately 550 FT thick. The reservoir is highly stratified and faulted, containing a hydrocarbon column that consists of a 200-FT thick oil column overlain by a 240-FT thick gas cap. The field was discovered in 1982 and placed on production in 1987. A peripheral waterflood project was implemented in 1991 to maintain the reservoir pressure and to improve the ultimate oil recovery. The field reached a peak production rate of over 85,000 BOPD after water injection was initiated. However, poor injectivity, formation sand back-flow into the injection wells, and poor injection profiles prevented the desired level and distribution of water injection from being achieved. These imbalances in injection caused gas cap expansion in some areas, and oil migration into the primary gas cap in others.
机译:Numbi油田位于安哥拉卡宾达飞地的离岸约20英里处。 Numbi油田的主要生产油藏,即57-05 Upper Vermelha油藏,由一系列堆积的,约550 FT厚的近岸沉积物组成。该储层高度分层和断层,包含一个烃柱,该烃柱由一个200英尺厚的油柱和一个240英尺厚的气顶覆盖。该油田于1982年被发现,并于1987年投入生产。1991年实施了外围注水项目,以维持油藏压力并提高最终采油率。开始注水后,该油田的峰值产量超过了85,000 BOPD。然而,不良的注入性,地层砂倒流到注入井中以及不良的注入轮廓阻碍了水注入的期望水平和分布。注入的这些不平衡导致某些地区的气顶扩张,而另一些地区的石油则迁移到主要的气顶。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号