Long submerged tunnel inspections: the Mantaro headrace tunnel,Central Andes Mountains, Peru

机译:漫长的水下隧道检查:秘鲁中部安第斯山脉的曼塔罗引水隧道

获取原文

摘要

Located in the central Andes mountains in Peru, the 900 megawattC.H. Antunez de Mayolo hydroelectric facility (Mantaro) generatesapproximately 70% of the region's power, which includes the capital cityof Lima (population 7 million). In a remote region approximately 350kilometres east of Lima, at an altitude of over 2500 meters above sealevel, the Mantaro facility (named after the river upon which it issituated) is a major engineering feat in itself. The headrace tunnelservicing the plant, 4.8 metres (15 feet) in diameter, has been boredthrough the Andes mountains and extends for an extraordinary distance of19.8 kilometres (66000 linear feet). Since its construction in the early1970s this facility has been unable to meet its maximum generatingcapacity due to a gradual loss of head pressure. The purpose of theinspection is to determine the cause of this problem and to identifypossible solutions. The paper describes the ROV developed to carry outthe inspection. The ROV incorporates an application designed sensorpackage, multiple camera suite, dual sonar, NDT probe, five functionmanipulator and a concrete coring drill
机译:900兆瓦位于秘鲁中部安第斯山脉中部 C.H. Antunez de Mayolo水力发电站(曼塔罗)发电 该地区约70%的电力(包括首都) 利马(人口700万)。在偏远地区大约350 利马以东公里,海拔2500多米 级别,Mantaro设施(以其所在的河流命名 位于)本身就是一项重大的工程壮举。头道隧道 维修直径为4.8米(15英尺)的工厂 穿过安第斯山脉,并延伸了一段非同寻常的距离 19.8公里(66000线性英尺)。建于初期 1970年代,该设施无法满足其最大发电量 容量的增加是由于头压的逐渐降低。目的 检查是为了确定此问题的原因并确定 可能的解决方案。本文介绍了ROV的开发进行 检验。 ROV包含一个应用程序设计的传感器 套件,多摄像头套件,双声纳,NDT探头,五功能 机械手和混凝土取芯钻

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号