Management Control and Early Warning Methods of Project Progress of Building Material Equipment Manufacturing Enterprises

机译:建材装备制造企业项目进度管理控制与预警方法

获取原文

摘要

The manufacturing project of building material equipment has a long cycle, large resource consumption, and great difficulty in the overall progress control of the project. The data entry method and the hierarchical early warning method based on the multi-terminal have been proposed to solve the problems of feedback on the progress data is not timely and the lack of pertinence of overdue early warning prompts. It makes full use of the advantages of different terminals to adapt to the complex conditions at different stages of the project for building material equipment manufacturing enterprises and makes progress data feedback more timely. Furthermore, the progress hierarchical early warning mechanism enables to accurately locate the relevant personnel when the schedule is overdue and improve information processing efficiency. This article gives examples of hierarchical early warning for project progress, and verifies the effectiveness of the method with specific building materials engineering projects.
机译:建材设备制造项目周期长,资源消耗大,项目总体进度控制难度大。提出了基于多终端的数据录入方法和分级预警方法,以解决进度数据反馈不及时,预警提示不及时的问题。充分利用不同终端的优势,适应建材设备制造企业项目不同阶段的复杂条件,使进度数据反馈更加及时。此外,进度分级预警机制可以在计划表过期时准确定位相关人员,并提高信息处理效率。本文提供了针对项目进度的分层预警示例,并针对特定的建筑材料工程项目验证了该方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号