Port of Long Beach Pier G Terminal: Terminal Rail Operation Efficiency Enhancement and Wharf Structural Integrity Improvements

机译:长滩码头G码头的港口:改善码头铁路运营效率并改善码头结构完整性

获取原文

摘要

The Pier G Terminal Rail Operation Efficiency Enhancement and Wharf Structural Integrity Improvements Project at the Port of Long Beach (POLB), through collaboration, coordination, and innovative design accomplished the following objectives: 1. restored operational efficiency, previously impaired for terminal rail operations on the Metro bulk loading terminal, where they no longer could run around the railyard on the mainline tracks; 2. provided innovative retrofit repair of a crack in the concrete wharf structure; 3. minimal disruption of terminal operations during construction through a well-planned program requiring collaboration and flexibility in construction schedules to accommodate the dynamic schedules of train unloading and ship loading. The design team developed a plan to eliminate the terminal operator's use of the mainline tracks to run around the rail yard for access to the head end of the rail cars by constructing an 870-ft long lead track between POLB's mainline tracks and the rail yard. The team developed a simulation model of rail operations to demonstrate and confirm the benefits of the proposed track modifications in the project planning stage to obtain support for the project from the terminal operators and stakeholders. Another aspect of the project involved an innovative repair of a longitudinal crack, approximately 1,200 feet in length, on the existing reinforced concrete wharf structure. The repair restored the structural integrity of the wharf structure. One of the primary project accomplishments involved creative response measures and procedures addressing frequent schedule alterations for the highly dynamic train and ship schedules during construction. The bid documents outlined likely encountered issues during construction and established reactive procedures to accomplish the construction with minimal impacts to the terminal's operations and productivity. Despite the scheduling challenges and other difficulties at the site, construction was accomplished with efficiency and without visual loss in productivity for the terminal operators.
机译:长滩港(POLB)的Pier G码头铁路运营效率提高和码头结构完整性改善项目通过协作,协调和创新设计实现了以下目标:1.恢复运营效率,以前在地铁大宗装卸站,在那里他们不再可以在干线轨道上绕着铁路场运行; 2.为混凝土码头结构中的裂缝提供了创新的翻新修复; 3.通过精心计划的计划,要求在施工进度表中进行协作和灵活调整,以适应列车卸货和船舶装载的动态进度,从而最大限度地减少了施工期间对码头运营的干扰。设计团队制定了一项计划,通过在POLB的干线轨道和铁路堆场之间建造一条870英尺长的铅轨,从而消除终端操作员使用干线轨道绕铁路堆场进入铁路车辆的前端的情况。该团队开发了铁路运营的仿真模型,以在项目计划阶段演示并确认提议的轨道修改的好处,以从终端运营商和利益相关者那里获得对项目的支持。该项目的另一个方面涉及对现有钢筋混凝土码头结构的纵向裂缝进行创新性修复,该裂缝长度约为1200英尺。修理恢复了码头结构的结构完整性。项目的主要成就之一是采用创造性的响应措施和程序,以解决在施工期间频繁更改高度动态的火车和船舶时间表的时间表。招标文件概述了施工过程中可能遇到的问题,并制定了应对措施,以在不影响码头运营和生产率的情况下完成施工。尽管工地面临着日程安排方面的挑战和其他困难,但施工仍能高效完成,并且不会给终端操作员带来生产力上的视觉损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号