Berths 214-220 Redevelopment Construction Lessons Learned at the Port of Los Angeles

机译:在洛杉矶港学习的泊位214-220重建建设经验教训

获取原文

摘要

The Port of Los Angeles (POLA) is one of the world's busiest seaports and leading gateway for international trade in the Western Hemisphere. Recently, POLA completed the Berths 214-220 redevelopment project. The project included upgrades to the wharf to accommodate larger ship sizes, upgrades to Berths 218-220 to increase the ship-to-shore crane from a 50-foot gauge to a 100-foot gauge, and improvements to the backland to increase terminal operation efficiency. The construction of the project occurred in multiple phases over a 22-month period (contractual duration). Several challenges were encountered during construction, such as conflicting obstructions during pile driving, unforeseen substructures conflicting with crane girder construction, observing sheet pile tolerances, mitigating disruption to allow for continued operation, and tenant-requested changes after design, among others. Construction of the project started in September 2015 and completed in May 2017, ahead of the 22-month contract duration. This paper discusses the challenges faced during construction, the method of resolution, and the lessons learned.
机译:洛杉矶港(POLA)是世界上最繁忙的海港之一,也是西半球国际贸易的主要门户。最近,POLA完成了泊位214-220的重建项目。该项目包括对码头进行升级以适应更大的船舶尺寸,对Berths 218-220进行升级以将船对岸起重机从50英尺长增加到100英尺长,以及对偏僻地区的改进以增加码头运营效率。该项目的建设在22个月的期限(合同期限)内分多个阶段进行。在施工过程中遇到了一些挑战,例如打桩过程中的障碍物冲突,无法预料的子结构与吊车梁结构发生冲突,观察薄板桩公差,减轻破坏以允许继续操作以及租户要求的设计变更等。该项目的建设于2015年9月开始,于22个月的合同期限之前于2017年5月完成。本文讨论了在施工过程中面临的挑战,解决方法以及汲取的教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号