Analysis and Countermeasure of 110KV Cable Joint Defects

机译:110KV电缆接头缺陷的分析及对策

获取原文

摘要

In recent years, cable faults increases year by year with the widespread use of power cable lines, among which, cable joint defects become one of the most important factors affecting the safe and stable operation of transmission cables. Recently, a switch protection work of the 110kV cable line 131 tripped, resulting in power cables change and its three T-connection lines power failure. After the troubleshooting the author found that there are defects in the intermediate of No. 1 connector well cable. In this paper, a detailed introduction about this accident of cable equipment is made and the cause is analyzed in-depth. The study found that there are some problems in the design and installation of the cable joint weld joint. Due to many this type of cable lines run in power grid, and at the same time to avoid such equipment defects in new project, the corresponding suggestions based on the cause analysis and the accident situation was put forward, which is beneficial to eliminate safety hazards in time and ensure the stable operation of the cable lines.
机译:近年来,随着电力电缆线路的广泛使用,电缆故障逐年增加,其中,电缆接头缺陷已成为影响传输电缆安全稳定运行的最重要因素之一。近来,110kV电缆线131的开关保护工作跳闸,导致电力电缆发生变化,并且其3条T型连接线断电。故障排除后,作者发现1号连接器井电缆的中间存在缺陷。本文对电缆设备的事故进行了详细介绍,并对其原因进行了深入分析。研究发现,电缆接头焊接接头的设计和安装存在一些问题。由于这类电缆线路多是在电网中运行,同时为避免新项目中出现此类设备缺陷,根据原因分析和事故情况提出了相应的建议,有利于消除安全隐患。及时确保电缆线的稳定运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号