首页> 外文会议>IEEE Conference on Energy Internet and Energy System Integration >Comparison of connection modes of 10kV switch station in Shanghai Fengxian New Town
【24h】

Comparison of connection modes of 10kV switch station in Shanghai Fengxian New Town

机译:上海奉贤新城10kV开关站接线方式比较

获取原文

摘要

The key to the landing of Energy Internet lies in the link of distribution network. Switch station is gradually taken as the core node in 10 kV cable network. In order to meet the load check of overhaul state "N-1" in spring and autumn of the distribution network to ensure efficiency, interworking and self-healing of Energy Internet, suitable connection mode of 10 kV switch station should be planned. In this paper, the connection mode of 10 kV switch station in Fengxian New Town is introduced. The connection mode of the target 10 kV switch station is demonstrated, and the malfunction situation is analyzed, and the processing logic is proposed. The 07 unit of Fengxian New town is selected to simulate the quantitative analysis and the comparison conclusion of two connecting methods is given.
机译:能源互联网登陆的关键在于配电网络的链接。交换站逐渐成为10 kV电缆网络的核心节点。为了满足配电网春季和秋季大修状态“ N-1”的负荷检查,以确保能源互联网的效率,互通性和自愈性,应规划10 kV开关站的合适连接方式。本文介绍了奉贤新城10 kV开关站的接线方式。说明了目标10 kV开关站的连接方式,分析了故障情况,并提出了处理逻辑。选择奉贤新市镇07单元进行定量分析,给出两种连接方法的比较结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号