Engineering structures for the CNM HSL

机译:CNM HSL的工程结构

获取原文

摘要

This paper presents an overview of engineering structures for the Nimes-Montpellier Bypass (also called CNM, French acronym of Contournement Nimes-Montpellier), which involves the design, execution and maintenance of the first dual-track, mixed high-speed passenger and freight rail corridor in France. With a total length of 80km, including 20km of connections to existing lines, this bypass includes 183 engineering structures: 12 viaducts, 1 cut-and-cover tunnel and 170 standard engineering structures. Overall, 4 years were necessary to build the CNM HSL, including 2.5 years for civil works and a total of 320,000m3 of concrete, 55,000T of steel reinforcements and 15,250T of steel frames were used. The line was opened at the end of 2017 and the maintenance is guaranteed until 2037 by the public-private partnership contract.
机译:本文概述了尼姆斯-蒙彼利埃绕道(也称为CNM,法语是Contournement Nimes-Montpellier的缩写)的工程结构,其中涉及第一条双轨混合高速客运和货运的设计,执行和维护。铁路走廊在法国。该旁路总长度为80公里,包括与现有线路的20公里连接,包括183个工程结构:12个高架桥,1个开挖和覆盖隧道以及170个标准工程结构。总体而言,建造CNM HSL需要4年,其中2.5年用于土木工程,总共使用了320,000m3混凝土,55,000T钢筋和15250T钢框架。该生产线于2017年底开业,并通过公私合营合同保证维护到2037年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号