首页> 外文会议>International Conference on Information Technology and Electrical Engineering >The Placement of the Transmission Lightning Arrester (TLA) at 150 kV Network using Fuzzy Logic
【24h】

The Placement of the Transmission Lightning Arrester (TLA) at 150 kV Network using Fuzzy Logic

机译:使用模糊逻辑在150 kV网络上放置输电避雷器(TLA)

获取原文

摘要

Lightning is one of the main considerations in the causes of the high voltage network's overhead lines failure. The lightning even also become one of the most dangerous event on the transmission system. The placement of the Transmission Lightning Arresters (TLAs) is employed for optimizing the location of protection equipment, reducing the cost of installation and identifying the risk of failure. This paper uses fuzzy logic to get the optimal placement location for Transmission Lightning Arresters (TLAs) and the model for transmission tower were simulated on a 150 kv high voltage network in the Maros-Sungguminasa. The simulation results confirm the optimal placement of the Transmission Lightning Arresters (TLAs) in the system.
机译:雷电是造成高压电网架空线故障的主要考虑因素之一。闪电甚至也成为传输系统上最危险的事件之一。传输避雷器(TLA)的位置用于优化保护设备的位置,降低安装成本并确定故障风险。本文使用模糊逻辑来获得输电避雷器(TLA)的最佳放置位置,并在Maros-Sungguminasa的150 kV高压网络上对输电塔的模型进行了仿真。仿真结果确认了传输避雷器(TLA)在系统中的最佳位置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号