首页> 外文会议>International Scientific Conference on Power and Electrical Engineering of Riga Technical University >An analytical approach for calculations of power system generation adequacy indices
【24h】

An analytical approach for calculations of power system generation adequacy indices

机译:一种计算电力系统发电充足指数的分析方法

获取原文

摘要

Generation adequacy indices (GAI) calculations are performed not only for electrical power system development problems but also for on-line control problems. Liberalization of power and energy market along with increased focus on renewable energy sources, which is motivated by both ecological and economical incentives, has led to comprehensive changes in power systems. Practically, the main mathematical method for calculating GAI of an electrical grid with complex structure is Monte-Carlo simulation (MCS) technique. It can provide sufficiently accurate results, but the simulation consumes really huge amount of computational time, especially for large power systems. Generation capacity that has to be installed in a power system for meeting reliability criteria depends not only on system demand but also on generation mix. The problem at hand is to improve computational efficiency of the GAI calculating technique without decrease in calculations accuracy. In order to solve the problem, this paper proposes an analytical method for GAI calculations, that is referred to as supplied demand algorithm (SDA). The paper compares the MCS technique and the SDA. The analyzed methods have been developed using the C# and VBA programming language. Input data for the methods includes generation mix data, generation and load probability indices. The comparison results allow to select the proper method for the GAI calculations and show the main factors that affect the resulting GAI.
机译:发电充足指数(GAI)计算不仅针对电力系统开发问题,而且还针对在线控制问题。电力和能源市场的自由化,再加上对生态能​​源和经济激励的推动,人们对可再生能源的关注日益增强,导致了电力系统的全面变革。实际上,用于计算具有复杂结构的电网的GAI的主要数学方法是蒙特卡罗模拟(MCS)技术。它可以提供足够准确的结果,但是仿真会消耗大量的计算时间,尤其是对于大型电源系统。为了满足可靠性标准,必须在电力系统中安装的发电能力不仅取决于系统需求,还取决于发电量。当前的问题是在不降低计算精度的情况下提高GAI计算技术的计算效率。为了解决该问题,本文提出了一种用于GAI计算的分析方法,称为供应需求算法(SDA)。本文比较了MCS技术和SDA。使用C#和VBA编程语言开发了分析方法。该方法的输入数据包括发电混合数据,发电和负荷概率指数。比较结果可以为GAI计算选择合适的方法,并显示影响所得GAI的主要因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号