首页> 外文会议>ASME international conference on ocean, offshore and arctic engineering >FULL CYCLE RESOURCE EVALUATION OF SMS DEPOSITS ALONG THE ARCTIC MID OCEAN RIDGE
【24h】

FULL CYCLE RESOURCE EVALUATION OF SMS DEPOSITS ALONG THE ARCTIC MID OCEAN RIDGE

机译:北极中部海脊沿线SMS沉积物的全周期资源评估

获取原文

摘要

Several hydrothermal vent sites have been discovered along the portion of the Arctic Mid-Ocean Ridge (AMOR) inside the extended Norwegian continental shelf (NCS). Seafloor massive sulfide (SMS) deposits are associated with these hydrothermal vent sites. These deposits contain significant amounts of valuable metals, such as copper, zinc, gold, and silver. Loki's Castle is one of the most promising sites along the AMOR, with two 20-30 m high and 100 m wide mound-shaped SMS deposits. It is located at a water depth of 2,400 m. A production system concept is proposed for a deep-sea mining operation at Loki's Castle based on the Nautilus Minerals' Solwara 1 project. The overall cost structure and design of the Nautilus' concept is in this study regarded feasible in AMOR in spite of the difference between the operating environment for the two locations. As the only relevant operational experience is De Beers' shallow-water diamond mining off the coast of South Africa and Namibia, most of the environmental criteria used are taken from offshore drilling. Based on the net operating time, and accounting for scheduled maintenance and waiting-on-weather time, an estimate for annual average production rate and an annual production volume are estimated. Significant downtime is expected in January and July. Significant uncertainties are associated with early phases of projects. Probabilistic cost, grade and price estimates allow dealing quantitatively with uncertainties by giving input variables as probability distributions. Monte Carlo simulations are in this study run for different sets of variables, and the resulting key performance indicators are given as distributions. This paper adapts and presents a methodology normally used to assess technological and economic feasibilities of oil and gas projects. The methodology is adapted to the assessment of deep-sea mining projects and is illustrated through the assessment of the case based on Loki's Castle ore characteristics and technologies planned for the Solwara 1 project with a cost structure adjusted according to AMOR conditions. Costs for processing, refining, waste disposal and logistics after ore arrival at onshore port is not included. The ore uncertainties are huge and the resources are with the present deposit knowledge speculative. Therefore, this study do not attempt to define any reserves.
机译:在扩展的挪威大陆架(NCS)内,沿北极中洋脊(AMOR)的部分发现了几个热液喷口。海底块状硫化物(SMS)沉积物与这些热液喷口部位有关。这些矿床包含大量有价值的金属,例如铜,锌,金和银。洛基城堡(Loki's Castle)是AMOR沿线最有希望的景点之一,有两个20-30 m高和100 m宽100 m的丘状SMS矿床。它位于2,400 m的水深处。在Nautilus Minerals的Solwara 1项目的基础上,提出了用于Loki's Castle深海采矿作业的生产系统概念。尽管两个地点的运营环境有所不同,但在本研究中,鹦鹉螺概念的总体成本结构和设计在AMOR中被认为是可行的。由于唯一的相关运营经验是戴比尔斯(De Beers)在南非和纳米比亚沿海的浅水钻石开采,因此所使用的大多数环境标准均来自海上钻探。基于净运行时间,并计入计划的维护和天气等待时间,可以估算出年平均生产率和年产量。预计在一月和七月会有大量的停机时间。重大不确定性与项目的早期阶段有关。概率成本,等级和价格估计通过将输入变量作为概率分布给出来定量地处理不确定性。在这项研究中,对不同的变量集进行了蒙特卡洛模拟,所得的关键绩效指标以分布形式给出。本文采用并提出了一种通常用于评估油气项目的技术和经济可行性的方法。该方法适用于深海采矿项目的评估,并通过根据Loki的Castle矿石特性和为Solwara 1项目计划的技术进行的案例评估进行了说明,并根据AMOR条件调整了成本结构。矿石到达陆上港口后的处理,精炼,废物处理和物流费用不包括在内。矿石的不确定性是巨大的,并且资源与目前的矿床知识具有投机性。因此,本研究未尝试定义任何储量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号