THE CHEMISTRY EXPERIENCE SUMMARY DURING THE ENGINEERING COMMISSIONING PERIOD OF FUJIAN NINGDE NUCLEAR POWER PLANT

机译:福建宁德核电站工程调试期的化学经验总结。

获取原文

摘要

In chemical researchers view, hot functional test is a verification of the Nuclear Power Plant before first fuel loading and commercial operation, which is the preparation for staffs, documents, instruments and sampling systems. So, chemistry department should use its own language, knowledge and experience to express their thoughts and what they have seen during the engineering commissioning period. As the first commercial operation nuclear power plant after Fukushima nuclear accident, during the four units commissioning period, chemical researchers accumulated a lot of good experience and feedbacks in the aspect of construction and commissioning for new nuclear power plant. For example, in order to ensure the personnel skill level, we must make special plans which include staff training laboratory construction, instrument and on-line system commissioning, and all of these should be timely adjusted and changed in order to be consistent with the engineering progress. In order to ensure the water quality of pipe flushing in different stages, such as cold functional test, hot functional test, we should set a strictly water chemical standard which based on the HAF103, and the standard should have some differences in different stage for one unit. In order to ensure the water chemistry in good performance especially after the unit going into commercial operation, the maintenance plan for equipment and system must be formulated, and then, a detailed monitoring plan must be executed. At the same time, a strict system flushing controlling mode can also provide a great benefits for water chemistry quality, especially in the period of start-up. In addition to these above experiences, chemistry researchers of Ningde nuclear power plant also accumulated a lot of good practices and feedbacks about dealing with some abnormal water quality activities, which can't be founded in commercial operation unit. For example, the aluminum (Al) content in the primary increased rapidly and beyond the specification limits in hot functional test and so on. This article will share the good practices and feedbacks of the first phase of Fujian Ningde nuclear power plant. We hope these good practices and experience feedbacks can provide good reference for the other new nuclear plants in the stage of design, construction, operation and maintenance in the future.
机译:在化学研究人员看来,热功能测试是对核电厂进行首次燃料装载和商业运行之前的验证,这是对人员,文件,仪器和采样系统的准备。因此,化学部门应该使用自己的语言,知识和经验来表达他们的想法以及他们在工程调试期间所看到的一切。作为福岛核事故之后的第一座商业运营核电站,化学研究人员在这四个单元的调试期间,在新核电站的建设和调试方面积累了很多良好的经验和反馈。例如,为了确保人员技能水平,我们必须制定特别计划,其中包括人员培训实验室的建设,仪器和在线系统的调试,所有这些都应及时调整和更改,以与工程技术保持一致。进步。为了保证冷,热等不同阶段冲洗管道的水质,应根据HAF103制定严格的水化学标准,并且该标准在不同阶段应具有一定的差异。单元。为了确保水化学性能良好,尤其是在该单元投入商业运行后,必须制定设备和系统的维护计划,然后执行详细的监控计划。同时,严格的系统冲洗控制模式还可以为水化学质量带来很大的好处,尤其是在启动期间。除上述经验外,宁德核电厂的化学研究人员还积累了许多良好的做法和反馈,以处理一些异常的水质活动,这在商业运营单位中是无法建立的。例如,原边中的铝(Al)含量迅速增加,超出了热功能测试等的规格限制。本文将分享福建宁德核电站一期工程的良好做法和反馈。我们希望这些良好做法和经验反馈能够在将来的设计,建造,运营和维护阶段为其他新核电站提供良好的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号