首页> 外文会议>International topical meeting on nuclear plant instrumentation, control, and human-machine interface technologies >SAFETY SOFTWARE RELEASE OPTIONS TO SUPPORT PLANT START-UP COMMISSIONING ACTIVITIES
【24h】

SAFETY SOFTWARE RELEASE OPTIONS TO SUPPORT PLANT START-UP COMMISSIONING ACTIVITIES

机译:用于支持工厂启动和调试活动的安全软件发布选项

获取原文

摘要

The schedule demands on new nuclear power plant site testing and commissioning programs challenge the plant's Instrumentation and Control (I&C) supplier's ability to provide certified safety software releases to meet the needs of these programs. This paper outlines the typical certified safety software development and certification process which follows a Waterfall software lifecycle model. The conflicts that result between supporting the site program and the safety software supplier's internal certification program are identified. An adapted "functional" safety release process is presented that supports the site program's needs for software changes and in parallel enables the safety software certification process to proceed. Comparisons between the two safety software release processes are examined and the benefits realized through the use of the adapted "functional" safety software release process are discussed.
机译:新的核电厂现场测试和调试计划的时间表要求挑战了电厂的仪器仪表和控制(I&C)供应商提供经过认证的安全软件版本以满足这些计划的需求的能力。本文概述了遵循Waterfall软件生命周期模型的典型认证安全软件开发和认证过程。确定了支持站点程序和安全软件供应商的内部认证程序之间导致的冲突。提出了一种经过修改的“功能性”安全发布流程,该流程可支持站点程序对软件更改的需求,并同时使安全软件认证流程能够继续进行。检查了两个安全软件发布过程之间的比较,并讨论了通过使用经过修改的“功能性”安全软件发布过程所实现的收益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号