【24h】

Review on unit commitment under uncertainty approaches

机译:不确定性方法下的单位承诺审查

获取原文

摘要

Wind power has already become an important renewable energy resource in many regions of the world. Because of its variability and uncertainty, integration of wind power presents a challenge that, if not adequately addressed, can jeopardize the operational reliability of a power system. Generally, generation unit commitment decisions are made once a day, i.e., the commitment decisions are made 24 or more hours ahead of the actual operation. Taking into account the uncertainty of wind power prediction, these decisions need to provide sufficient flexibility at a minimum price. This paper describes the current practice and analyzes unit commitment formulations available in literature highlighting their advantages and shortcomings.
机译:在世界许多地区,风能已经成为重要的可再生能源。由于其可变性和不确定性,风电集成提出了一个挑战,如果不能充分解决,则可能危及电力系统的运行可靠性。通常,发电机组承诺决策每天做出一次,即,承诺决策是在实际运行之前24小时或更长时间做出的。考虑到风力发电预测的不确定性,这些决策需要以最低的价格提供足够的灵活性。本文介绍了当前的做法,并分析了文献中提供的单位承诺公式,突出了它们的优点和缺点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号