首页> 外文会议>Engineers' Society of Western Pennsylvania;Annual International Bridge Conference >Hydrodemolition Repairs of the Liberty Tunnel in Pittsburgh, Pennsylvania
【24h】

Hydrodemolition Repairs of the Liberty Tunnel in Pittsburgh, Pennsylvania

机译:宾夕法尼亚州匹兹堡自由隧道的加氢拆除维修

获取原文

摘要

The Liberty Tunnel was constructed in the mid – 1920’s as a major connector from the suburbsto downtown Pittsburgh, PA. After almost 100 years of service a major rehabilitation wasrequired. Because of the traffic flows of over 100,000 vehicles per day, the tunnel could not beclosed during construction and the repairs had to be done fast. The Pennsylvania Departmentof Transportation specified hydrodemolition to be used to remove deteriorated concrete fromthe tunnel walls and specified that work could only be done at night during low traffic volumesto achieve the goals of rapid construction and minimal traffic impacts.
机译:自由隧道建于1920年代中期,是郊区的主要连接器 到宾夕法尼亚州匹兹堡市中心。服务将近100年后,进行了一次重大修复 必需的。由于每天有超过100,000辆车的流量,因此隧道无法 施工期间已关闭,必须快速进行维修。宾夕法尼亚州部 交通部指定的加氢拆除系统,用于从中去除劣化的混凝土 并指定只能在夜间人流量少的情况下进行工作 以实现快速建设和最小化交通影响的目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号