【24h】

The Influence of Topside on Installation Design in Ultra-shallow Sea Water

机译:顶面对超浅海水安装设计的影响

获取原文

摘要

As platforms become larger and heavier, the weight of topside alsoincreases. Due to the limit of water depth, the large crane cannot operatein ultra-shallow water areas. Based on the new platform of Jinzhou 9-3adjusted project in the Bohai Sea, the authors analyzed the large topsideinstallation mode, choose two four-legs jacket for the platform support,use special deck supporting unit (DSU) and optimize the operation draft,and reviewed the effect of topside float-over installation design onoperations in ultra-shallow water areas. The report will bring forwardnew ideas for the marginal oilfield development, and summarize lessonslearnt from the platform design, construction and installation in ultrashallowsea water.
机译:随着平台变得越来越大,越来越重,顶侧的重量也越来越大 增加。由于水深的限制,大型起重机无法操作 在超浅水区。基于锦州9-3的新平台 渤海项目调整后,作者分析了较大的顶面 安装方式,选择两个四腿外套作为平台支撑, 使用特殊的甲板支撑单元(DSU)并优化操作吃水深度, 并回顾了顶部浮顶安装设计对 在超浅水区作业。该报告将提出 边际油田开发的新思路,并总结经验教训 从超浅的平台设计,施工和安装中学到了经验 海水。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号