首页> 外文会议>European conference on soil mechanics and geotechnical >Dynamic replacement columns with aggregate transition zone stabilized by geosynthetics for embankment foundation over weak deposits
【24h】

Dynamic replacement columns with aggregate transition zone stabilized by geosynthetics for embankment foundation over weak deposits

机译:具有聚集过渡区的动态替换柱,通过地球合子稳定弱矿床路堤基础

获取原文

摘要

Paper in form of Case Study discuss non-standard geotechnical application in form of high motorway embankment located over weak deposits founded on columns made by dynamic replacement technology (DR) combined with transmission layer in form of ge-omatresses - unbound aggregate stabilized with triaxial geogrids. Numerical analysis were made at design stage including deformations of soil formations under embankment and geomatress layer. Effect of installation of dynamic replacement columns (DR) on stress & strain behavior within transition zone was part of analysis. Additional unique aspect of this application is coming from man-made aggregate -mining shales were approved for use to interact with geogrid in transmission layer over columns.
机译:以案例研究的形式讨论以高高速公路堤防的形式讨论非标岩土技术,位于由动态替换技术(DR)的柱上的弱沉积物上,以GE-OMATRESSES的形式结合透射层 - 用三轴土工格栅稳定的未结合骨料。在设计阶段进行了数值分析,包括在路堤和地质层下的土壤形成变形。动态替换栏(DR)在过渡区内的应力和应变行为上的效果是分析的一部分。本申请的其他独特方面来自人造的聚合 - 正在批准的Shales被批准用于在柱上的传输层中与地理小格互动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号