首页> 外文会议>International Conference on Measuring Technology and Mechatronics Automation >Improving On-Site Management Practice for Chinese Construction Projects Based on Analytic Hierarchy Process (AHP) Method
【24h】

Improving On-Site Management Practice for Chinese Construction Projects Based on Analytic Hierarchy Process (AHP) Method

机译:基于层次分析法(AHP)的中国建设项目现场管理实践的改进

获取原文

摘要

Based on the analysis of large number cases, the essay finds that there are many problems on site management of Chinese construction projects in the present. Though Analytic Hierarchy Process(AHP) Method, the essay summarizes the main problems related to schedule, quality and safety. Because construction is a complicated system and every aspect is closely integrated. The management of construction site is especially important. This essay tries to summarize the problems of construction site management and analyze the reasons, hoping to give some reference to operators and managers.
机译:通过对大量案例的分析,发现目前中国建设项目的现场管理存在很多问题。通过层次分析法(AHP),本文总结了与进度,质量和安全有关的主要问题。因为建设是一个复杂的系统,并且各个方面都紧密集成在一起。施工现场的管理尤为重要。本文试图总结施工现场管理中存在的问题,并分析其原因,以期为经营者和管理者提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号