首页> 外文会议>Annual meeting of the transportation research board;Transportation Research Board >CHALLENGES RAISED BY FREIGHT FOR THE OPERATIONS PLANNING OF A SHARED-USE RAIL NETWORK. A FRENCH PERSPECTIVE
【24h】

CHALLENGES RAISED BY FREIGHT FOR THE OPERATIONS PLANNING OF A SHARED-USE RAIL NETWORK. A FRENCH PERSPECTIVE

机译:货运对共享铁路网的运营计划提出了挑战。法国视角

获取原文

摘要

Operating rail infrastructures that are shared among different uses is complex. In Western Europe, the predominance of passenger traffic over freight has traditionally led to thorough scheduling of capacity use, with an increasing tendency to anticipate through the design of regular-interval timetables. The paper discusses the specific challenges posed by fitting freight into the timetabling process for a mixed-use rail network, based on current French experience. The analysis is carried out from the perspective of the infrastructure manager. It is mainly supported by the results of a series of about 30 interviews, carried out in 2012 and 2013 with the parties involved in the timetabling process. The paper provides a comprehensive understanding of the process in terms of organization, rules and practices, with an emphasis on the characteristics of freight traffic compared with passenger traffic. The author highlights three key management issues for the French infrastructure manager when dealing with freight: (1) the uncertainty surrounding the mid-long term development of the rail freight market at the national level; (2) the heterogeneity resulting both from the diversity of commodities and the profiles and behaviors of the various capacity applicants; (3) the volatility of some freight traffic resulting in a great amount of activity in the later stages of the timetabling process. If uncertainty about the future appears to be a highly sensitive issue in the French context, heterogeneity and volatility of freight traffic can be perceived as management challenges that may be experienced, to a greater or lesser degree, on other rail networks.
机译:在不同用途之间共享的运营铁路基础设施非常复杂。在西欧, 传统上,客运量超过货运量导致了对运力的全面安排 通过定期间隔时间表的设计来预期的趋势越来越大。论文 讨论将货物纳入混合铁路的时间表过程所带来的特定挑战 网络,基于当前的法国经验。分析是从 基础架构经理。它主要受到一系列约30项访谈的结果的支持 在2012年和2013年与参与时间表的各方合作。本文提供了一个 在组织,规则和实践方面对流程有全面的了解,并具有 强调货运量与客运量相比的特征。作者重点介绍 法国基础设施经理在处理货运时的三个关键管理问题:(1) 国家一级铁路货运市场中长期发展的不确定性; (2) 商品多样性以及商品的概况和行为造成的异质性 各种能力的申请人; (3)一些货运的波动性导致大量的活动 在时间表过程的后期阶段。如果对未来的不确定性看起来非常严重 在法国的敏感问题中,货运的异质性和波动性可以被认为是 其他铁路网络或多或少会遇到的管理挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号