首页> 外文会议>International Universities Power Engineering Conference >Design of electrical power supply system in a typical petroleum refinery
【24h】

Design of electrical power supply system in a typical petroleum refinery

机译:典型石油炼油厂电源系统设计

获取原文

摘要

The electrical system shall be designed economically for continuous and reliable services, safely to personnel and equipment, ease of maintenance and operation, minimum power losses, protection of equipment mechanically, interchangeability of equipment and addition of the of the loads. In order to achieve the above goals and obtain the desired results, a scientific study based on different theories and practical experiences will be needed. In this study, the power supply of Transnet Pipeline Terminal 2 (TM2) petroleum refinery in Heidelberg, the criteria and methods of designs of normal networks, electrical equipment and protection of the system will be discussed and investigated. A single line diagram will be presented as the outcome of the design. The single line diagram includes 88kV, 11kV and 400V voltage levels. In the second phase of the design single line diagram is consequently simulated by the ETAP software. The study will cover the following: load flow, short circuit current and motor starting. The intention of this study is to create solution in different ways, electrical loads should be categorized in this energy industry as well as energizing these loads by a stable power supplies. In addition the key role of the short circuit impedance of the transformers in control of the short circuit will be presented. Furthermore the selection procedure of the electrical equipment and accessories including cables, transformers, circuit breaker, relays, and etc. are presented. The following factors such as the size of equipment, losses and voltage drops will be checked by load flow study. A comprehensive study of the short circuit current calculations is implanted and can be observed how the system can be checked by the results of this study. In the dynamic study of the system, the biggest motor starting is simulated and the impacts of the voltage dips due to starting of this motor on the other running motors are shown. Since numerous types of equipment on one hand and the research on the economic matters on the other hand are time consuming, the scope of this report will mainly concentrate on the technical factors and as a results it does not cover the economic aspects. Moreover, high standard engineering in the petroleum industry is essential to design electrical system. It is noted that more economical options are acceptable as long as they end up with the same technical results or better.
机译:电气系统应设计在经济持续和可靠的服务,安全人员和设备,便于维护和运行,最低功率损耗,设备的保护机械,设备互换性和另外的的负载。为了实现上述目标,并取得了预期的效果,就需要根据不同的理论和实践经验的科学的研究。在这项研究中,在海德堡Transnet公司管道终端2(TM2)炼油厂的电源,标准和正常网络,电气设备和系统的保护的设计的方法将被讨论和调查。单线图将作为设计的结果。单线图包括88kV,11kV的和400V的电压电平。在设计单线图的第二阶段因此通过ETAP软件模拟。该研究将包括以下:负载过流,短路电流和电动机起动。这项研究的目的是建立以不同的方式解决,电力负荷应在此能源行业进行分类,以及由稳定的电源激励这些负载。另外在短路的控制变压器的短路阻抗的关键作用将提交。此外,电气设备和附件,包括电缆,变压器,断路器,继电器,以及等等的选择过程被呈现。以下因素,如设备,损失和电压下降的大小将由潮流分析进行检查。短路电流计算的综合研究植入,可以观察系统如何能够通过这项研究的结果进行检查。在该系统的动态研究,最大的电机起动模拟和电压跌落由于这种电机在运行其他电动机起动的影响所示。因为一方面众多类型的设备上,而在另一方面,经济问题研究耗费时间,这份报告的范围将主要集中在技术因素和作为结果时,不会涉及经济方面。此外,在石油行业高标准的工程是必不可少的设计电气系统。值得注意的是,更经济的选择,因为他们结束了相同的技术效果或更好的是,只要可以接受的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号