首页> 外文会议>IEEE Rural Electric Power Conference >Bonding requirements for conductive poles
【24h】

Bonding requirements for conductive poles

机译:导电杆的粘接要求

获取原文

摘要

Increasing load density at electric utilities has driven the trend toward larger distribution conductors and higher settings on overcurrent protective equipment. Not only are pickup values of feeder breakers and reclosers increasing, the protective curves are often slower to achieve coordination with downstream devices. Where there are larger conductors and slower protective settings you will often find more application of conductive distribution poles to carry the structural loads imposed by larger conductors.
机译:提高电力公司的负载密度推动了较大的分布导体和过流保护设备上更高的环境趋势。 送料断路器和重熔器的拾取值不仅增加,保护曲线通常较慢,以实现与下游设备的协调。 在有较大导体和较慢的保护设置的情况下,您通常会发现更多的导电分配磁极在较大导体施加的结构载荷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号