A COMPLETE FAILURE OF A FLOATOVER INSTALLATION WITH STRAND JACK LIFTING SCHEME AND A GREAT SUCCESS OF FLOAT-ON AND FLOAT-OFF RESCUE OPERATION

机译:带有完全千斤顶提升方案的浮桥安装完全失败,浮桥和浮桥救援操作成功完成

获取原文

摘要

An innovative and complicated strand jack lifting technology was applied to floatover installation of DPP integrated topsides in South China Sea. Due to initial failure to lower the four outer support legs, an unfortunate chain of events occurred thereafter, thus yielding a complete failure of the floatover installation never happened in history. A rescue operation was carried out in the two following days to successfully salvage both the topsides and the floatover barge stranded inside the jacket slot in extraneous circumstances. This paper presents the floatover systems and the failure events of the innovative low-deck floatover technology, as well as the successful rescue operations by floating on and floating off the topsides onto the eight-legged jacket. Big lessons learned are also addressed here.
机译:将创新和复杂的绞线千斤顶提升技术应用于南海DPP集成顶板的浮空安装。由于最初未能降低四个外部支撑腿,此后发生了一系列不幸的事件,从而导致浮标安装完全失效,这是历史上从未发生过的。接下来的两天进行了一次救援行动,成功救助了在外部情况下搁浅在夹克衫槽内的顶部和浮桥驳船。本文介绍了浮桥系统和创新的低甲板浮桥技术的失败事件,以及通过漂浮在顶部或漂浮在八腿夹克上的成功救援行动。这里也介绍了所学到的重大经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号