首页> 外文会议>International conference on cold regions engineering >Envision Case Study: Seaport Dolphin Berth Improvements
【24h】

Envision Case Study: Seaport Dolphin Berth Improvements

机译:设想案例研究:海港海豚泊位的改进

获取原文

摘要

The sustainable performance of a typical small marine capital improvement project was measured using the Envision™ 2.0 Guidance Manual and rating system during the fall of 2012. The Port of Everett used Envision to gauge the effectiveness of its sustainability programs, community outreach, and commitments to environmental stewardship. Through this project, the Port has a new roll on/roll off (RO/RO) facility that increases operational capacity for supporting the international construction and manufacturing industries. Using a minimal impact design strategy of integrating with an existing marine facility, construction costs and environmental impacts were reduced. The strategy included installing new-and repairing existing-mooring structures, as well as upgrading the existing fender system and removing creosote-treated timber piles. The study shows how parts of the project relate to each Envision category and how points were achieved. With this study, the project team was able to determine the compatibility and functionality of Envision with seaport infrastructure projects. Involved in multiple sustainability programs, the Port welcomed the chance to continually improve their performance across different applications using Envision, such as in capital improvement projects. Opportunities for the Port to improve its sustainability planning and design practices are outlined in the report. Although this project was evaluated at the end of the 100 percent design phase, the Port came away with multiple examples that will improve their sustainability performance on future projects by using Envision as a guideline. Those include, but are not limited to: performing a life cycle analysis, setting sustainability goals in the project design phase, and further developing a sustainable procurement policy for contractors and vendors.
机译:在2012年秋季,使用Envision™2.0指导手册和评级系统对一个典型的小型海洋资本改善项目的可持续绩效进行了评估。埃弗里特港使用Envision评估其可持续性计划,社区宣传和对项目的承诺的有效性。环境管理。通过该项目,港口拥有新的滚装/滚装(RO / RO)设施,可提高运营能力以支持国际建筑和制造业。使用与现有海事设施整合的最小影响设计策略,可降低建筑成本和环境影响。该战略包括安装新的和修复现有的系泊结构,以及升级现有的挡泥板系统和清除经杂酚油处理过的木桩。该研究显示了项目的各个部分如何与每个Envision类别相关以及如何实现积分。通过这项研究,项目团队能够确定Envision与海港基础设施项目的兼容性和功能。港口参与了多个可持续发展计划,欢迎有机会使用Envision不断提高其在不同应用程序中的性能,例如在资本改善项目中。报告概述了港口改善其可持续性规划和设计实践的机会。尽管在100%设计阶段结束时对该项目进行了评估,但波特港还是采用了多个示例,这些示例将通过使用Envision作为准则来提高其在未来项目中的可持续性表现。这些包括但不限于:执行生命周期分析,在项目设计阶段设置可持续性目标,以及进一步为承包商和供应商制定可持续采购政策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号