首页> 外文会议>International Conference on Hydroinformatics >MODELING OF FLOOD ROUTING THROUGH WATER RESERVOIR DAM WITH STEPPED SPILLWAY
【24h】

MODELING OF FLOOD ROUTING THROUGH WATER RESERVOIR DAM WITH STEPPED SPILLWAY

机译:带阶梯溢洪道的水库大坝洪水路径建模

获取原文

摘要

1. The physical model has allowed confirm the coefficients of consumption (m) in the mathematical model for conditions of high levels in the water reservoir; 2. The obtained hydrograph of draft discharges will allow confirm conditions of velocities and aeration in the lower reach of water reservoir; 3. In modern hydraulic engineering construction of many countries increasingly, disseminating receive the concrete spillway dam with step grassroots drain face. For example, in China at present has already built several tens of waterworks facilities, outlet works which are designed; 4. A new trend for construction of spillway is modernization of structures bulls, arranged on the crests of the latter for control of gates. The essence of this modernization is the expansion unit aft these bulls, mating with toe-ledge. This allows you to: modify the overall picture of current flow in the zone bull; to convert the stream of a two-dimensional to three-dimensional; to sharply intensify the processes of aeration and clearing excess energy flow; reduce the risk of cavitation in areas of hard concrete surfaces bulls and drain grassroots face; 5. Typical parameters of the discharges of the twelve river waterworks China, built and commissioned in recent years, as well as having stepped grassroots drain face.
机译:1.物理模型允许在数学模型中确定水库水位高的情况下的消耗系数(m); 2.获得的吃水排放水位图将确定蓄水层下游的速度和通气条件; 3.在越来越多的国家的现代水利工程建设中,散布有阶梯基层排水面的混凝土溢洪坝。例如,目前在中国已经建设了数十座自来水厂的设施,出水口设计; 4.溢洪道建设的新趋势是现代化结构公牛,布置在后者的顶部以控制闸门。现代化的实质是在这些公牛后方的扩展单位,并与脚趾壁架配合。这样,您可以:修改区域牛市中电流的整体状况;将二维流转换为三维流;急剧加强曝气过程,清除多余的能量流;减少在硬质混凝土表面,多头和排水基层表面产生气穴的风险; 5.近年来建成投产的中国十二个河水厂的排水典型参数,以及基层排水面呈阶梯状。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号