Port Infrastructure: Marine Commerce Terminal in New Bedford, MA

机译:港口基础设施:MA的新贝德福德海洋商务码头

获取原文

摘要

The Marine Commerce Terminal (MCT) in New Bedford, MA is the first port facility in the nation designed to support the construction, assembly and deployment of offshore wind projects, as well as handle bulk, break-bulk, container shipping and large specialty marine cargo. The MCT, which is located inside New Bedford Harbor and protected by an USACE hurricane barrier, is in close proximity to offshore wind planning areas along the East Coast that are under consideration for future development. The MCT consists of a 1,200-linear-foot bulkhead system with deep-water access and roughly 20 acres of port terminal space engineered to sustain mobile crane and storage loads that rival the highest capacity ports in the nation. The most demanding requirement of the terminal structure is supporting a ground pressure load of 4,100 psf and the maximized reach of fully loaded cranes (500 tonnes at a distance of 30 meters) to operate right up to the offshore edge of the platform and laterally for the entire 1,000 foot length of the newly constructed facility. As part of construction, the project included the dredging and removal of approximately 280,000 cubic yards of contaminated sediment and the landside cleanup of 18,000 tons of contaminated soil caused by industrial waste generated during the 1930s and 1940s, a significant environmental benefit. Geotechnical challenges included high bearing pressures, maximizing beneficial reuse of dredged materials, and blasting near sensitive structures. Construction of the MCT was completed in early 2015. This paper discusses the port bulkhead facility design including the uniqueness of the site, dredging considerations, structural design, and geotechnical engineering.
机译:MA的新贝德福德的海洋商务终端(MCT)是全国第一家港口设施,旨在支持海上风力项目的建设,装配和部署,以及手柄散装,散货,集装箱运输和大型专业海洋货物。 MCT位于新贝德福德港口,受到Usace飓风障碍的保护,靠近东海岸的海上风力规划区域,正在考虑未来的发展。 MCT由1,200英尺舱壁系统组成,具有深水接入,大约20英亩的港口终端空间,以维持移动起重机和存储负载,竞争最高容量端口。最苛刻的终端结构要求支撑4,100psf的地压载荷,最大化的完全装载的起重机(500吨距离为30米的500吨),以便在平台的海上边缘和横向上运行全部1000英尺长的新建设施。作为建筑的一部分,该项目包括疏浚和去除约280,000立方码的受污染沉积物,由20世纪30年代和20世纪40年代生成的工业废物引起的18,000吨污染土壤的陆地清理,这是一个重大的环境效益。岩土电石挑战包括高轴承压力,最大化疏浚物的有益再利用,以及近距离敏感结构的爆破。 MCT的建设于2015年初完成。本文讨论了港口舱壁设施设计,包括该网站的独特性,疏浚考虑,结构设计和岩土工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号