Seismic Improvements and Upgrade of a Wharf Using an Innovative Ground Improvement Scheme

机译:使用创新的地面改进计划的地震改进和升级码头

获取原文

摘要

During the magnitude (M_w) 7.7, 1993 Guam earthquake, which caused significant damages to coastal structures throughout the area, X-Ray wharf in the island showed signs of liquefaction and lateral spreading and seismically induced settlement up to 30 cm. The existing wharf is approximately 450 m long and consists of a combination of steel sheet pile bulkheads with a single level of tie-backs and steel sheet pile bulkheads with relieving platforms. Even though the damage to the wharf was not significant during the 1993 earthquake, it was found that the existing wharf would not meet the current two-level seismic performance criteria per the latest Unified Facilities Criteria, (UFC) 4-152-01 (DoD, 2005, 2012). Among the various concepts evaluated to upgrade the existing wharf, constructing a new wharf in front of the existing wharf was found to be the most effective solution and taken forward for final design. A new sheet pile bulkhead wall approximately 10.7 m away from the existing sheet pile bulkhead will be constructed and the space between the new and old sheet pile bulkheads will be filled with improved granular backfill. Cement deep soil mixing (CDSM) was selected as the most cost-effective ground improvement technique to improve the granular fill and weak foundation materials. Construction of the new wharf is presently under way. The paper discusses the seismic design philosophy, geotechnical field investigation, site characterization, seismic analyses, and ground improvement design in an informative manner useful to practicing engineers.
机译:在幅度(M_W)7.7,19​​93的关岛地震期间对整个地区的沿海结构造成了重大损害,该岛中的X射线码头显示出液化和横向扩散的迹象,地震诱导沉降高达30厘米。现有的码头约为450米长,包括钢板桩舱壁的组合,具有单一级别的焊接和钢板桩舱壁,具有缓解平台。尽管在1993年的地震中对码头的损坏并不重要,但发现现有的码头不会符合目前每次统一设施标准的目前的两级地震性能标准(UFC)4-152-01(DOD) ,2005,2012)。在升级现有码头的各种概念中,发现在现有的码头前构建新的码头是最有效的解决方案,并提出了最终设计。将构建新的纸桩隔板距离现有的纸张桩舱壁约10.7米,并将填充新的和旧板桩舱壁之间的空间,并填充改进的粒状回填。水泥深层混合(CDSM)被选为最具成本效益的地面改进技术,以改善粒状填充和弱基础材料。目前正在进行新的码头的建设。本文以一种对练习工程师有用的信息的方式讨论了地震设计理念,岩土实地调查,场地特征,地震分析和地面改进设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号