【24h】

Discussion on Harnessing Measures of the Xiaobeiganliu Reaches of the Yellow River

机译:黄河小北干流治理措施探讨。

获取原文

摘要

In recent years the silting in the Xiaobeiganliu reaches of the Yellow River has been serious,causing new problems to river flood control,engineering layout and works defense.Based on the practice of the Yellow River harnessing,this paper analyzes the problems existing in the harnessing of the Xiaobeiganliu reaches of the Yellow River in six aspects,namely,the channel flood discharge capacity has declined,the river pattern can not be effectively controlled,the phenomenon of serious danger caused by mere small flood has occurred frequently,the floodplain land suffered from serious salinization,the construction standard of flood control roads were too low and the construction of flood control non-engineering measures has lagged behind.It is put forward such harnessing measures as: carrying out water and sediment regulation; carrying out research on the law of "bottom tearing" scouring; speeding up construction of river harnessing projects; building village protective projects; raising construction standard of floodplain roads; making preparation earlier for flood control emergency rescue; and strengthen construction of flood control non-engineering measures.
机译:近年来,黄河小贝干流河段淤积严重,给河道防洪,工程布置和工程防御带来了新的问题。本文在黄河治理的实践基础上,分析了治理过程中存在的问题。黄河小北干流河段有六个方面,即河道泄洪能力下降,河流格局得不到有效控制,仅小洪水就造成了严重的危险现象,洪泛区遭受盐碱化严重,防洪道路建设标准过低,防洪非工程措施建设滞后。进行“底部撕裂”冲刷规律的研究;加快河道治理工程建设;建设乡村保护项目;提高泛滥公路建设标准;尽早做好防洪应急救援的准备;加强防洪非工程措施建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号